|
The NCAR Mesa Laboratory semiannual building maintenance shutdown is scheduled for Saturday, 9 November from 04001800. During this time the Mesa Lab and Fleischmann Buildings will experience intermittent electrical, heating, and air conditioning interruptions, some for extended periods.
It is advisable for all Mesa Lab staff to power down any sensitive equipment on Friday evening.
Portions of SCD-supported computing services, the Mass Storage System (MSS), and supercomputer production will be unavailable from 0400 through approximately 1800.
All services including Front Range GigaPop (FRGP) monitoring, MSS services, and supercomputer production will resume by 1800 or before on 9 November. If services are not available after 1800, please call 303-497-1200 for updated information.
|