|
  
Sparks fly as a contractor welds a valve onto a steel pipe below the raised floor. The valve will connect to pipes carrying chilled water to the Computer Room from the Mechanical Room when a new chiller is installed in in May 2002.
Photo: Lynda Lester -- NCAR/SCD
|